13733
| 1 | 1. | | Zoning Item | HANKS Coastal Development Permit, Special Permit
Record Number PLN-2017-13733
Assessor’s Parcel Number (APN) 514-112-019
Westhaven Area
A Coastal Development Permit (CDP) and Special Permit (SP) to an Emergency CDP and SP (CDP 17-047E, SP-17-074E approved August 29, 2017), under Humboldt County Code Section 312-15, which allowed the applicant to remove up to 15 hazardous trees from within 50 feet of a habitable structure. The subject trees were mature redwood trees, 20”-50” DBH, with an estimated age of 50 years. The trees showed a measurable lean towards the residence and were close to rubbing against the roof. The roof of the residence and other accessory structures were damaged from falling branches in past storms, and other trees had existing branches that appeared to be weakening. | approved | |
Action details
|
Video
|
13043
| 1 | 3. | | Zoning Item | Full Cup Farmstead, LLC, Special Permit
Record Number PLN-13043-CUP
Assessor’s Parcel Number: 316-064-011
Willow Creek area
A Special Permit for existing 10,000 square feet (SF) of outdoor cannabis cultivation with ancillary propagation. Irrigation water is sourced from rainwater catchment. Onsite processing is proposed within an existing barn. Power is provided by Pacific Gas and Electric Company (PG&E). The proposed project also includes a Special Permit to reduce the required 600-foot setback from public lands. | approved | |
Action details
|
Video
|
16116
| 1 | 2. | | Zoning Item | Bar 7 K Farms, LLC, Special Permit
Record Number PLN-2019-16116
Assessor’s Parcel Number(s) 216-154-024 and 216-141-001
Alderpoint Area
A Special Permit for 20,000 square feet of new outdoor commercial cannabis cultivation. Solar panels provide electricity and an existing well provides irrigation. The annual water usage is 150,000 gallons with 50,000 gallons of storage. Within two years, rainwater catchment tanks totaling 100,000 gallons will be constructed. An ancillary nursery of 1,000 square feet is also proposed. Drying will occur onsite and all other processing will occur offsite. | approved | |
Action details
|
Video
|