15663
| 1 | 1. | | Zoning Item | Henderson Coastal Development Permit
Application Number PLN-2019-15663
Case No. 15663
Assessor Parcel Number 400-131-002
1565 Peninsula Drive, Manila Area
Project Description: A Coastal Development Permit to demolish an existing dilapidated 1,447 sq. ft. mobile home (CUP-72-85), 221 sq. ft. shed, and 285 sq. ft. barn/garage and replace with a new 2,890 sq. ft. manufactured home and 1,000 sq. ft., 14 ft. tall detached garage/workshop building, and a replacement fence. The entire project parcel is within the 100 feet protective buffer of a wetland located on the neighboring parcel and a reduced wetland development setback buffer has been determined through the string line method. | approved | |
Action details
|
Not available
|
15999
| 1 | 2. | | Zoning Item | MCSD Hiller Sewer Lift Station Upgrades Coastal Development Permit
Case Number PLN-2019-15999
Assessor Parcel Number 510-271-015
675 and 795 Hiller Road, McKinleyville
Project Description: A Coastal Development Permit for lift station pump upgrades for the McKinleyville Community Services District (MCSD) Wastewater Management Facility (WWMF). The Hiller Street Lift Station facility will be treated with minor alterations to improve energy and operational efficiency. Applicable project components include installation of new submersible pumps in the existing wet well, transformer, concrete pad, and a prefabricated concrete control enclosure. The work is to occur within the facility grounds in a 400 sq. ft. area and over a two-month period commencing June 2020. Work hours would be Monday-Friday 7:00 a.m. to 7:00 p.m. and possibly an occasional Saturday. Less than 50 cubic yards of excavating/trenching is proposed and there will be no vegetation removal. | approved | |
Action details
|
Not available
|
11492
| 1 | 3. | | Zoning Item | Bamboo Farms, Inc. Special Permits
Application Number: 11492
Case Number: SP17-114
Assessor’s Parcel Number: 219-061-001
3546 Lower Thomas Road, Miranda area
Project Description: A Special Permit for 9,620 square feet of outdoor cannabis cultivation in greenhouses using light deprivation. Water for irrigation is sourced from rain catchment in two 150,000-gallon ponds. Drying occurs on-site. Trimming and other processing activities occur off site at a licensed processing facility. One full-time employee works on site year-round, and three additional employees work seasonally. Electricity is provided by an existing solar array with a back-up generator. The project includes a Special Permit for activity within Streamside Management Areas consisting of two irrigation ponds with outflows into a Class III drainage and the restoration of two decommissioned historic cultivation sites. | approved | |
Action details
|
Not available
|