Skip to main content
Meeting Name: Zoning Administrator Agenda status: Final
Meeting date/time: 12/2/2021 10:00 AM Minutes status: Final  
Meeting location: Planning and Building Department 3015 H St. Eureka, CA 95501
Regular Meeting - Virtual
Published agenda: Agenda (PDF) Agenda (PDF) Published minutes: Action Summary Action Summary  
Meeting video:  
Attachments:
File #Ver.Agenda #NameTypeTitleActionResultAction DetailsVideo
11334 11. Zoning ItemHumboldt Heritage MBC, Special Permit Record Number PLN-11334-SP Assessor’s Parcel Number: 220-191-035 Whitethorn area A Special Permit for 8,200 square foot (SF) of existing outdoor cannabis cultivation with 1,400 SF of ancillary propagation. Irrigation water is sourced from a creek diversion. Water storage would total of 222,100 gallons. Estimated annual water usage is 150,000 gallons. Drying, curing, bucking, and trimming occurs onsite, with all other processing occurring offsite at a licensed processing or manufacturing facility. Power is provided by Pacific Gas and Electric Company (PG&E). A Special Permit is also requested for development within the Streamside Management Area (SMA) related to continued use and maintenance of the water diversion infrastructure.approved  Action details Video Video
12768 12. Zoning ItemOtto Farms, LLC, Special Permit Record Number PLN-12768-SP Assessor’s Parcel Number’s (APN) 317-033-006 Shower’s Mountain/Pilot Ridge Area A Special Permit for 7,620 square feet (sq. ft.) of pre-existing mixed-light cannabis cultivation with 800 sq. ft. of ancillary propagation. Irrigation water will be provided by a point of diversion from an unnamed creek under Water Right Certificate H100066, and the applicant is requesting a Special Permit to allow the continued use of the stream diversion. Estimated annual water needed for irrigation is 66,400 gallons, and 54,600 gallons of water storage is designated for irrigation and one (1) 2,500-gallon water tank is designated for fire suppression needs. An additional 15,000 gallons of water storage is proposed within three (3) 5,000-gallon tanks, which will bring the total water storage for irrigation on-site to 69,600 gallons. Drying will occur on-site, and trimming will be done off-site at a licensed processing facility. Electricity will be provided by a Honda EU2000i generator on-site.approved  Action details Video Video