File #Ver.Agenda #NameTypeTitleActionResultAction DetailsVideo
24-1526 11. Informational ReportNative Humboldt Farm, Zoning Clearance Certificate and Special Permit Assessor Parcel Numbers (APN) 217-282-015 Record No.: PLN-11454-ZCC Blocksburg area A Zoning Clearance Certificate for 5,000 square feet of existing outdoor cannabis cultivation. Water is stored in 15 hard tanks (34,500 gallons) and the applicant proposes to add an additional two hard tanks (5,000 gallons) for a total of 39,500 gallons of available water storage. Estimated annual water usage is 41,000 gallons. All processing is completed at a licensed off-site processing facility. Electricity is sourced from PGE. Also requested is a special permit for the ongoing use of a point of diversion for the water for irrigation from an existing on-site spring.   Not available Not available
24-1530 12. Informational ReportLarabee Farm, LLC, Special Permit and Lot Line Adjustment Assessor Parcel Numbers (APN) 210-051-070-000, 210-051-068-000 Record No.: PLN-11888-SP Bridgeville area A Special Permit for the continued operation of an existing cannabis cultivation site consisting of 9,000 square feet of mixed light cannabis cultivation in greenhouses and 900 square feet of ancillary nursery space. Irrigation water is sourced from a permitted, hydrologically disconnected well. Water storage for irrigation totals 19,750 gallons. The applicant’s estimated annual water use is approximately 95,000. Drying and other processing will occur on-site. Power is provided by a PG&E and a generator for emergencies. A lot line adjustment is also proposed between APN 210-051-070-000 (20.16 acres) and 210-05-068-000 (22.17 acres) to transfer of approximately 0.9 acres in an equal exchange with no net change in either parcel size.   Not available Not available
24-1537 14. Informational ReportHogan Special Permit Assessor Parcel Numbers: 208-241-018-000 Record Numbers: PLN-12162-SP Dinsmore area Hogan seeks a Special Permit (SP) for an existing 5,325-square-foot (SF) outdoor cultivation. Water for irrigation is sourced from an existing 38,000-gallon rain catchment pond. Estimated annual water usage is 50,000 gallons (11.04 gallons/SF/year). Total water storage is 51,500 gallons in a pond and hard tank storage with an additional 5,000 gallons of storage for fire suppression via (2) 2,500 storage tanks. Processing will be performed offsite at a licensed third-party processing facility. Power is provided by generators but is conditioned to convert to a renewable source by January 1st, 2026.   Not available Not available
24-1538 15. Informational ReportGreentech Industry, Inc. Conditional Use Permit Denial Assessor’s Parcel Numbers: 222-222-013 Record Numbers: PLN-12823-CUP Redway Area DENIAL of a Conditional Use Permit for 5,000 square feet of existing mixed light and 8,150 square feet of existing outdoor cannabis cultivation.   Not available Not available
24-1536 13. ResolutionCannaDreams, LLC; Special Permits Assessor Parcel Numbers (APN) 108-026-006 Record No.: PLN-12088-SP Ettersburg area A Special Permit for the continued operation of an existing cannabis cultivation site consisting of 9,500 square feet of outdoor cannabis cultivation in greenhouses and 950 square feet of ancillary nursery space, a Special Permit to reduce the setback to BLM public land, and a Special Permit for reduction of the Streamside Management Area setback to allow for a hydroelectric facility on the onsite stream and for the point of diversion. Irrigation water is sourced from a point of diversion and is subject to forbearance. There will be 171,000 gallons of water storage on the parcel designated for cannabis irrigation and 6,500 gallons reserved for fire suppression. The applicant’s estimated annual water use is approximately 88,700 gallons. Drying will occur onsite and other processing will occur offsite at a licensed third-party facility. Power is provided by a solar array with a generator used to supply supplemental power. There will be two employees on site at peak.   Not available Not available