| 1 | 1. | | Informational Report | Review and approval of the August 03, 2023, Action Summary. | received and filed | Pass |
Action details
|
Video
|
23-1144
| 1 | 2. | | Resolution | Ram Ram Bliss 2, LLC Conditional Use Permit
Assessor Parcel Number 216-094-009-000
Record No.: PLN-12987-CUP
Harris Area
A Conditional Use Permit for 11,762 square feet of existing light deprivation and full sun outdoor commercial cannabis cultivation. Approximately 252,000 gallons per year (21.4 gallons per sf) is required for irrigation needs. Water is sourced from three onsite rainwater catchment ponds and stored in the ponds and hard tank storage for a total of 605,400 gallons of water storage. Processing activities including drying, curing, and trimming occur onsite within a 968 square foot building. Power is provided through a mix of solar and generator use. | continued | Pass |
Action details
|
Video
|
23-1146
| 1 | 3. | | Resolution | Mayers Flat Farm, LLC
Assessor Parcel Numbers (APN) 211-372-006
Record No.: PLN-12651-SP
Myers Flat area
Mayers Flat Farm, LLC., seeks a Special Permit to expand an existing 8,750-square-foot (SF) cannabis cultivation operation consisting of two light-deprivation greenhouses to 41,300 SF of outdoor cultivation in 11 light-deprivation greenhouses. A Special Permit is required for the buffer reduction of the storage pond which is located within the delineated wetland buffers of two ephemeral wetlands. | continued | Pass |
Action details
|
Not available
|
23-1141
| 1 | 4. | | Resolution | Blair - Parcel Map Subdivision
Application Number PLN-2022-17614
Assessor Parcel Number (APN) 403-081-023
3706 Pigeon Point Road, Eureka area
A Minor Subdivision of an approximately 20-acre parcel into four parcels of approximately five acres each. The parcel is currently developed with an approximately 3,620 square foot single family residence and accessory structures that will remain on proposed Parcel 2. Community water is provided by Humboldt Community Services District and on-site wastewater treatment systems are proposed. A CALFIRE exception to the dead-end road length and road width has been approved by CALFIRE. | approved | Pass |
Action details
|
Video
|
23-1142
| 1 | 5. | | Resolution | Hooven - Parcel Map Subdivision
Application Number PLN-2022-17660
Assessor Parcel Number (APN) 511-191-003
2190 Hooven Road, McKinleyville area
A Minor Subdivision of an approximately 10-acre parcel into two 5-acre parcels. The parcel is currently developed with a residence, garage/shop, and on-site wastewater treatment system that will remain on proposed Parcel 1. Proposed Parcel 2 will be vacant. There is an existing groundwater well on the developed parcel that both parcels will use for domestic purposes and an on-site wastewater treatment system will serve the vacant parcel. CALFIRE has approved an exception request for the road width and length of the dead-end road. An exception to the minimum required road easement width is also requested, to allow for the existing 20-foot wide road access easement to be utilized. | approved | Pass |
Action details
|
Video
|
23-1143
| 1 | 6. | | Resolution | Happy Valley Farms, Inc. Conditional Use Permit and Zoning Clearance Certificate
Assessor Parcel Number 210-051-081
Record No.: PLN-12166-CUP
Assessor Parcel Number 210-051-064
Record No.: PLN-12170-ZCC
Bridgeville area
A Conditional Use Permit for 12,500 square feet (SF) of existing Outdoor commercial cannabis cultivation supported by a 1,220 square foot ancillary nursery on APN 210-051-081, and a Zoning Clearance Certificate for 2,500 SF of existing Outdoor commercial cannabis cultivation on APN 210-051-064 and 240 SF ancillary nursery on APN 210-051-081. Water is sourced exclusively from a permitted groundwater well on APN 210-051-064 that has been analyzed for hydrologic connectivity to surface waters and nearby domestic water sources. The annual estimated water budget for both projects is 145,000-gal., and is supported by 180,000-gal. of existing water storage. Additional water storage in the amount of 35,000-gal. will be installed via approved grant funding, bringing the total water storage between the two parcels to 215,000-gal. Processing such as bucking, drying | approved | Pass |
Action details
|
Video
|