Meeting Details

Meeting Name: Zoning Administrator Agenda status: Final
Meeting date/time: 5/4/2023 10:00 AM Minutes status: Final  
Meeting location: Planning and Building Department 3015 H St. Eureka, CA 95501
Regular Meeting - Virtual
Published agenda: Agenda (PDF) Agenda (PDF) Published minutes: Action Summary Action Summary  
Agenda packet: Not available
Meeting video:  
Attachments:
File #Ver.Agenda #NameTypeTitleActionResultAction DetailsVideo
23-607 11. Informational ReportSanchez Modification to Coastal Development Permit (CDP 04-89) and Special Permit (SP 04-98), and Notice of Merger (NOM) Assessor Parcel Number (APN) 111-133-049 Record No.: PLN-2022-17907 Shelter Cove area A Modification to Coastal Development Permit (CDP) and Special Permit (SP) previously approved under records number CDP 04-89, SP 04-98 (APN 111-133-015). This modification is for the voluntary merger (NOM) for those lands presently identified as APN 111-133-049, formerly assigned APNs 111-133-014 and -015, which were previously combined into a single APN for tax purposes and for a 1,200 sq. ft. detached garage and associated grading. The subject property is comprised of Lots 4 and 5 of Block 136 of Tract 42, of the Shelter Cove Subdivision. Lot 4 is currently developed with a single-family residence permitted under a previously approved Coastal Development Permit and Special Permit (CDP-04-89, SP-04-98). Lot 5 is vacant. This modification will allow for the formal merging of the two lots under a Notice of Merger (NOM) and permit the proposed development of a 1,200 sq. ft. detaapproved  Action details Not available
23-608 12. Informational ReportUGUUJ, LLC Conditional Use Permit Assessor’s Parcel Number (APN) 316-076-013 Application Number PLN-11956-CUP Willow Creek area The denial of a Conditional Use Permit for existing 10,000 square feet outdoor cannabis cultivation operation. Cannabis is grown in three (3) greenhouses using light deprivation techniques for two (2) cycles. Irrigation water source is a surface water diversion from Cedar Creek. Water storage totals 80,000 gallons in sixteen tanks and a bladder. Drying and curing take place on site in an existing outbuilding. Product will be taken off site for processing. Up to three employees will be required during peak. Power is provided by an existing solar array and backup generators.denied  Action details Not available