Please note: this meeting's minutes have not been finalized yet. Actions taken on legislation and their results are not available.

Meeting Details

Meeting Name: Zoning Administrator Agenda status: Final
Meeting date/time: 6/16/2022 10:00 AM Minutes status: Draft  
Meeting location: Planning and Building Department 3015 H St. Eureka, CA 95501
Regular Meeting - Virtual
Published agenda: Agenda (PDF) Agenda (PDF) Published minutes: Action Summary Action Summary  
Agenda packet: Not available
Meeting video:  
Attachments:
File #Ver.Agenda #NameTypeTitleActionResultAction DetailsVideo
22-804 11. Zoning ItemDiscussion and Possible Adoption of Resolution Authorizing Remote Teleconference Meetings of the Humboldt County Zoning Administrator for the period of June 16, 2022 through July 16, 2022, Pursuant to the Ralph M. Brown Act.   Not available Not available
22-777 11. Zoning ItemMHG, LLC; Special Permit Record Number PLN-10931-SP Assessor’s Parcel Number 216-382-031 Alderpoint area A Special Permit for 9,996 square feet of existing outdoor commercial cannabis cultivation supported by a 900 square foot ancillary nursery. The annual irrigation water budget of 155,000 gallons is sourced from an existing, disconnected well and supported by 20,000 gallons of storage. Power is provided by a generator and there will be up to four employees at peak operation. The project includes onsite processing and restoration and restocking of the riparian setback for a Class III stream.   Not available Not available
22-778 12. Zoning ItemVesuvio Gardens, LLC; Special Permit Record Number PLN-12605-ZCC Assessor’s Parcel Number (APN) 220-141-009 Whitethorn area A Special Permit for an existing 10,000 square feet of outdoor cannabis cultivation, and ancillary drying and propagation activities. Irrigation is provided by a point of diversion for which the applicant has demonstrated a valid water right, and a proposed rainwater catchment system. The applicant estimates annual water use at 100,000 gallons and proposes to purchase and install 100,000 gallons of hard water tank storage to adhere to forbearance requirements, with the intent to gutter greenhouses to provide rainwater catchment as an additional water source. Drying will occur on the parcel, with all other processing activities occurring off site at a licensed third-party processing facility. Power will be supplied via a solar array, with a generator on site for emergency backup use.   Not available Not available