File #: 23-1118    Version: 1 Name:
Type: Informational Report Status: Passed
File created: 7/27/2023 In control: County Administrative Office
On agenda: 10/3/2023 Final action: 10/3/2023
Title: Bid Authorization for the Ferndale Veterans Hall Americans with Disabilities Act Modification Project, Project Number 2022-802
Attachments: 1. Staff Report, 2. Attachment 1- Architectual Drawings, 3. Attachment 2- Lead Specification Manual
Previous Action/Referral: 21-351, 20-1318
To: Board of Supervisors

From: County Administrative Office

Agenda Section: Consent

Vote Requirement: Majority

SUBJECT:
title
Bid Authorization for the Ferndale Veterans Hall Americans with Disabilities Act Modification Project, Project Number 2022-802
end

RECOMMENDATION(S):
Recommendation
That the Board of Supervisors:
1. Receive and approve the attached plans and specifications for Ferndale Veterans Hall Americans with Disabilities Act Modification Project, Project Number 2022-802; and
2. Authorize the Clerk of the Board to advertise the above-referenced project as required by Section 22037 of the California Public Contract Code, with bids to be opened on Oct. 31, 2023 at 2 p.m.

Body
SOURCE OF FUNDING:
ADA Internal Service Fund (3552); 2020 Finance Plan

DISCUSSION:
On Sept. 7, 2016, the County of Humboldt entered into a Consent Decree with the United States Department of Justice that required the commencement of the Humboldt County Americans with Disabilities Act (ADA) Compliance Project. The purpose of the Humboldt County ADA Compliance Project is to bring all facilities owned and/or leased by the County of Humboldt that provide programs, services and activities to the public into compliance with the ADA. The Ferndale Veterans Hall ADA Modification Project is part of this compliance effort.

On Aug. 27, 2020, the County of Humboldt entered into a consultant services agreement with Whitchurch Engineering to design ADA improvements for the Ferndale Veterans Hall. The construction project consists of proposed ADA and deferred maintenance improvements to the building which includes three new accessible parking stalls, an accessible path of travel that links the public right of way to the facility's accessible entrance, a new accessible ramp, addition of accessible service counters inside both the canteen and the kitchen and new accessible doors and hardware in multiple locations within the facility.

The construction schedule is expected to take...