File #: 22-1527    Version: 1 Name:
Type: Informational Report Status: Passed
File created: 11/7/2022 In control: Public Works
On agenda: 11/29/2022 Final action: 11/29/2022
Title: Bid Award for Network Operations Center HVAC Replacement Project, Project Number 162830
Attachments: 1. Staff Report, 2. 162830-Bid Opening Results-110122.pdf, 3. 162830- Section 00 52 00 Agreement Forms.pdf, 4. 162830 Agreement Executed.pdf

To: Board of Supervisors

From: Public Works

Agenda Section: Consent

SUBJECT:
title
Bid Award for Network Operations Center HVAC Replacement Project, Project Number 162830
end

RECOMMENDATION(S):
Recommendation
That the Board of Supervisors:
1. Receive and file the bids for the Information Technology (IT) Network Operations Center HVAC Replacement Project;
2. Award the project to the lowest responsible and responsive bidder, BESC, Inc. dba California Heating, Arcata, California, in the amount of $310,000 for the base bid plus additive alternate; and
3. Authorize the Board Chair to execute the agreement with BESC, Inc. dba California Heating, after staff approves the bonds and insurance.

Body
SOURCE OF FUNDING:
American Rescue Plan Act (ARPA) 3232-120200

DISCUSSION:
The Information Technology Building at 839 4th Street is in need of replacement of the rooftop chillers and an interior air handling unit serving the county's network infrastructure. The existing system is degrading quickly and is backed up with a modular cooling unit which is not a long-term solution for cooling the space. Loss of these cooling systems could be catastrophic to the county's information technology infrastructure.

Public Works, through its mechanical engineering consultants, have produced plans and specifications to replace the rooftop chiller units, piping and the non-functional interior air-handling unit with a new system to serve the facility. The engineer's estimate for this project including an additive alternate was $305,000, with the entire project budget including hard and soft costs being $350,000.

The lowest responsible responsive bidder's bid included a $250,000 Base Bid and $60,000 for the Additive Alternate. Removal of the additive alternate from the awarded scope of work is not recommended. The additive alternate includes replacement of one (1) of the two (2) existing rooftop chillers that is currently functional but is very close to being unrepai...

Click here for full text