File #: 17603    Version: 1 Name:
Type: Zoning Item Status: Consent Agenda
File created: 7/29/2022 In control: Zoning Administrator
On agenda: 8/4/2022 Final action:
Title: Jill and Michael Brooke: Coastal Development Permit and Special Permit Record Number PLN-2022-17603 (01/27/22) Assessor's Parcel Number (APN) 515-191-047 Trinidad Area A Coastal Development Permit (CDP) for the new construction of a two-story, one-bedroom single-family residence (approx. 2,409 SF; 1,717 SF footprint), detached accessory building housing a therapy pool and gym (approx. 1,102 SF), a detached one-car garage (approx. 512 SF), a new driveway, pathways, landscaping, and related site improvements. The project would be served by an existing onsite well and proposed OWTS. A Special Permit is required for Design Review. Tree removal would occur within the 30-foot defensible space for the proposed residence. No grading or fill is proposed.
Sponsors: Trip Giannini
Attachments: 1. 17603 Brook CDP Staff Report 8.4.22, 2. 17603 Brook CDP Executive Summary 8.4.22

Title

Jill and Michael Brooke: Coastal Development Permit and Special Permit

Record Number PLN-2022-17603 (01/27/22)

Assessor’s Parcel Number (APN) 515-191-047

Trinidad Area

 

A Coastal Development Permit (CDP) for the new construction of a two-story, one-bedroom single-family residence (approx. 2,409 SF; 1,717 SF footprint), detached accessory building housing a therapy pool and gym (approx. 1,102 SF), a detached one-car garage (approx. 512 SF), a new driveway, pathways, landscaping, and related site improvements. The project would be served by an existing onsite well and proposed OWTS. A Special Permit is required for Design Review. Tree removal would occur within the 30-foot defensible space for the proposed residence. No grading or fill is proposed.

 

Recommendation

Adopt the resolution to take the following actions: 1) Find that the Zoning Administrator has considered project as Categorically Exempt from environmental pursuant to Section 15303 of the CEQA Guidelines, 2) make all of the required findings for approval of the Coastal Development Permit and 3) approve the Brook Coastal Development Permit as recommended by staff subject to the recommended conditions.