File #: 22-675    Version: 1 Name:
Type: Informational Report Status: Passed
File created: 5/17/2022 In control: Aviation
On agenda: 6/7/2022 Final action: 6/7/2022
Title: Non-Federal Reimbursable Agreement with the Federal Aviation Administration for the Murray Field Airport Engineering and Technical Support for Runway 12 PAPI and Runway 30 VASI Replacement
Attachments: 1. Staff Report, 2. Reimbursable Agreement AJW-FN-WSA-22-WP-005240 (Reimbursable Agreement) (002)

To: Board of Supervisors

From: Aviation

Agenda Section: Consent

SUBJECT:
title
Non-Federal Reimbursable Agreement with the Federal Aviation Administration for the Murray Field Airport Engineering and Technical Support for Runway 12 PAPI and Runway 30 VASI Replacement

end
RECOMMENDATION(S):
Recommendation
That the Board of Supervisors:
1. Approve and authorize the Director of Aviation to execute the attached Non-Federal Reimbursable Agreement with the Federal Aviation Administration (FAA) for Murray Field Airport engineering and technical support for Runway (RWY) 12 Precision Approach Path Indicator (PAPI) and RWY 30 Visual Approach Slope Indicator (VASI) replacement with a PAPI; and
2. Authorize the Director of Aviation to execute any future amendments after review by County Counsel, Risk Management, and the County Administrative Office.

Body
SOURCE OF FUNDING:
Airport Enterprise Fund (3530)

DISCUSSION:
The runway at Murray Field Airport currently utilizes a VASI at each end of the runway. The VASI uses a system of lights to provide visual decent guidance information to a pilot when landing an aircraft to ensure the pilot remains on the proper glide path to the runway. A VASI is an older technology which is being replaced a newer technology known as a PAPI. This project will replace both VASIs with the newer technology, PAPI.

The VASI on Runway 12 was damaged by an aircraft many years ago and was not repaired at the time. The FAA has agreed to provide the new PAPI equipment for both ends of the runway and will maintain this equipment after the installation is complete.

The Non-Federal Reimbursable Agreement will provide funding for the FAA to perform engineering review in support of the county's establishment of RWY 12 PAPI and the replacement of RWY 30 VASI with a PAPI.

FINANCIAL IMPACT:
The estimated cost associated with this agreement is $57,792.68. The county would be responsible for prepaying the entire estimated cost of...