Title:
|
Big River Farm, LLC; Conditional Use Permit and Special Permit
Record Number PLN-11892-CUP
Assessor's Parcel Number: 108-023-008
Shelter Cove area
A Conditional Use Permit for 22,000 square feet (SF) existing outdoor cannabis cultivation. The project is within 600 feet of public land and requires a Special Permit to reduce the setback to BLM public land to 40 feet. Juvenile plants are propagated on-site in a 2,400 square foot ancillary nursery. Irrigation water is sourced from a groundwater well. The estimated annual irrigation water usage is 208,000 gallons. Water storage totals 69,600 gallons in eight (8) hard tanks. Applicant proposes construction of a 200,000-gallon rainwater catchment pond. Processing, including drying, curing and trimming, will occur on-site in an existing 2,400 SF facility. Power for the cultivation operation is provided by P.G.&E.
|