File #: 21-161    Version: 1 Name:
Type: Zoning Item Status: Consent Agenda
File created: 1/29/2021 In control: Zoning Administrator
On agenda: 2/4/2021 Final action: 2/4/2021
Title: Resource Utilization Company Conditional Use Permit, Surface Mining Permit and Reclamation Plan Renewal Case Number PLN-2018-15020 (CUP-02-31X/SMP-02-03X/RP-02-03X) Assessor's Parcel Number 529-131-011 Orleans Area Renewal of a 15-year permit term for a previously approved rock quarry surface mining operation which was previously approved in 2003 and allowed the quarry to extract, process and stockpile material for a period of 15 years. The project involves a Conditional Use Permit, Surface Mining Permit, Reclamation Plan, and review of financial assurances for a surface mining operation involving an upland rock quarry with a proposed total extraction of 300,000 cubic yards (cy) of aggregate material over an expected life of 15 years. Up to 50,000 cy of sand and gravel would be extracted per year. The operation would involve extracting aggregate from the quarry, separating it and then stockpiling it onsite. Usable rock product consists of moderately to loosely consolidated sand and ...
Attachments: 1. 15020 Staff Report 2.4.21.pdf, 2. Attachment 3_IS - MND Wilcox Processing Facility July 2019.pdf, 3. Attachment 4_15020 Surface Mining and Reclamation Plan.pdf

Title

Resource Utilization Company Conditional Use Permit,

Surface Mining Permit and Reclamation Plan Renewal

Case Number PLN-2018-15020 (CUP-02-31X/SMP-02-03X/RP-02-03X)

Assessor’s Parcel Number 529-131-011

Orleans Area

 

Renewal of a 15-year permit term for a previously approved rock quarry surface mining operation which was previously approved in 2003 and allowed the quarry to extract, process and stockpile material for a period of 15 years. The project involves a Conditional Use Permit, Surface Mining Permit, Reclamation Plan, and review of financial assurances for a surface mining operation involving an upland rock quarry with a proposed total extraction of 300,000 cubic yards (cy) of aggregate material over an expected life of 15 years. Up to 50,000 cy of sand and gravel would be extracted per year. The operation would involve extracting aggregate from the quarry, separating it and then stockpiling it onsite. Usable rock product consists of moderately to loosely consolidated sand and gravel with cobble materials of primarily 8” diameter or less. The quarry operations would involve excavation, processing, loading and hauling. No blasting or drilling would be conducted on site. Heavy equipment to be used on site includes excavators, loaders, and caterpillar tractors, dump trucks. Rock would be hauled by 12 to 14-yard dump trucks. The project includes a caretaker’s residence served by on-site sewage disposal system.

Recommendation

Adopt the Draft Mitigated Negative Declaration and make all of the required findings for approval of the Conditional Use Permit, Surface Mining Permit, and Reclamation Plan based on evidence in the staff report, and adopt the Resolution approving the Resource Utilization Company project subject to the recommended conditions.