File #: 20-1625    Version: 1 Name:
Type: Informational Report Status: Passed
File created: 12/9/2020 In control: Public Works
On agenda: 1/5/2021 Final action: 1/5/2021
Title: Storm Damage Repair to Alderpoint Road (6B165) Post Miles 9.45, 10.52, 11.94 and 11.98
Attachments: 1. Staff Report, 2. Alderpoint Road South Special Provisions_2020-12-09.pdf, 3. Alderpoint Road South Planset 2020-12-09.pdf
Previous Action/Referral: 22-801
To: Board of Supervisors

From: Public Works

Agenda Section: Consent

SUBJECT:
title
Storm Damage Repair to Alderpoint Road (6B165) Post Miles 9.45, 10.52, 11.94 and 11.98
end

RECOMMENDATION(S):
Recommendation
That the Board of Supervisors:
1. Approve the attached plans and specifications for the Alderpoint Road (6B165) Post Miles 9.45, 10.52, 11.94 and 11.98 Storm Damage Repair Project; and
2. Direct the Clerk of the Board to advertise the above-mentioned project as required by Section 22037 of the California Public Contract Code, with bids to be opened on Tuesday, February 2, 2021, at 2:00 p.m.

Body
SOURCE OF FUNDING:
Road Fund (1200); Federal Highway Administration Emergency Relief Storm Damage Funds

DISCUSSION:
On March 7, 2017, the Governor of the State of California declared a disaster for Humboldt County due to severe winter storms, flooding and mudslides. Alderpoint Road (6B165) Post Miles 9.45, 10.52, 11.94 and 11.98, in the Garberville area of southern Humboldt County, experienced roadway settlement and shoulder failure. Emergency temporary repairs were done at the time of the disaster to maintain essential traffic flows.

On November 8, 2019 and November 19, 2019, the Humboldt County Department of Public Works ("Public Works") received Federal Highway Administration funding approval to proceed with the Alderpoint Road (6B165) Post Miles 9.45, 10.52, 11.94 and 11.98 Storm Damage Repair Project. Public Works subsequently prepared the attached plans and specifications for the project based on topographic surveys of the damaged areas that were prepared by Points West Surveying Company and geotechnical studies prepared by Crawford and Associates. The work proposed in the attached plans and specifications consists of constructing welded wire retaining walls and reinforced embankment, installing sub-drainage and storm drainage systems, restoring the roadway to original width and adding sediment and erosion control items.

Accordin...