File #: 19-338    Version: 1 Name:
Type: Zoning Item Status: Passed
File created: 3/1/2019 In control: Planning and Building
On agenda: 3/7/2019 Final action: 3/7/2019
Title: Sustainable Medicinals, Conditional Use Permit and Special Permit Application Number: 11800 Case Number CUP-16-388 and SP-17-179 Assessor's Parcel Numbers (APN): 529-035-022 On the northwest side of Ishi Pishi Road in the Orleans Area Project Description: A Conditional Use Permit is requested to allow 21,000 square feet (SF) of existing outdoor cannabis cultivation and a Special Permit for a wholesale nursery limited to seed production. A Special Permit is also requested to allow a setback reduction from 600 feet to approximately 300 feet from public lands (Six Rivers National Forest), and development within a Streamside Management Area (SMA) for maintenance and use of an existing water diversion and micro-hydropower system as well as for restoration work associated with the removal of previous greenhouses.
Attachments: 1. CUP-16-388 Staff Report.pdf

Title

Sustainable Medicinals, Conditional Use Permit and Special Permit

Application Number: 11800

Case Number CUP-16-388 and SP-17-179

Assessor’s Parcel Numbers (APN): 529-035-022

On the northwest side of Ishi Pishi Road in the Orleans Area

 

Project Description:  A Conditional Use Permit is requested to allow 21,000 square feet (SF) of existing outdoor cannabis cultivation and a Special Permit for a wholesale nursery limited to seed production. A Special Permit is also requested to allow a setback reduction from 600 feet to approximately 300 feet from public lands (Six Rivers National Forest), and development within a Streamside Management Area (SMA) for maintenance and use of an existing water diversion and micro-hydropower system as well as for restoration work associated with the removal of previous greenhouses.

Recommendation

Find the project except from environmental review pursuant to Sections 15301 and 15333 of the State CEQA Guidelines, make all of the required findings for approval of the Conditional Use Permit and Special Permit based on evidence in the staff report and any public testimony, and adopt the Resolution approving the proposed Sustainable Medicinals project subject to the recommended conditions.