File #: 21-708    Version: 1 Name:
Type: Informational Report Status: Passed
File created: 5/25/2021 In control: Public Works
On agenda: 6/15/2021 Final action: 6/15/2021
Title: Bridge Preventive Maintenance Project
Attachments: 1. Staff Report, 2. BPMP 5904 (140) (154) (155) Plans_05-25-2021.pdf, 3. BPMP 5904 (140) (154) (155) Special Provisions_05-25-2021.pdf
Previous Action/Referral: 22-1748
To: Board of Supervisors

From: Public Works

Agenda Section: Consent

SUBJECT:
title
Bridge Preventive Maintenance Project
end

RECOMMENDATION(S):
Recommendation
That the Board of Supervisors:
1. Approve the attached plans and specifications for the Bridge Preventive Maintenance Project; and
2. Direct the Clerk of the Board to advertise the above-mentioned project as required by Section 22037 of the California Public Contract Code, with bids to be opened on Tuesday, July 20, 2021, at 2:00 p.m.

Body
SOURCE OF FUNDING:
Road Fund (1200); Federal Highway Administration's Bridge Preventive Maintenance Program

DISCUSSION:
The Bridge Preventive Maintenance Project includes three (3) separate federal aid projects that provide maintenance for twenty-five (25) bridges in the Humboldt County Road System. Federal Project 5904(140) provides maintenance, including, without limitation, replacing timber stringers, deck, and railing, modifying an abutment, repairing concrete posts and rails, and replacing asphalt approaches, to four (4) bridges in the southern portion of Humboldt County. Federal Project 5904(154) provides maintenance, including, without limitation, replacing asphalt approaches, to nine (9) bridges located in the southern half of Humboldt County. Federal Project 5904(155) provides maintenance, including, without limitation, replacing asphalt approaches and joint seals, repairing spalled areas on the deck surface, and preparing and treating bridge decks with methacrylate, to twelve (12) bridges throughout Humboldt County.

The Humboldt County Department of Public Works ("Public Works") received construction approval from the Federal Highways Administration for federal Projects 5904(140), 5904(154) and 5904(155) on April 24, 2019, May 8, 2020, and June 2, 2020. Public Works prepared the attached plans and specifications for the Bridge Preventive Maintenance Project based on bridge inspection reports that were prepared by the California Depa...

Click here for full text