Title: Blue Lake Gravel Bar renewal of SMARA Reclamation Plan and Review of Financial Assurance Cost Estimates Assessor's Parcel Numbers (APN) 312-161-007, 312-161-020, 313-231-001, 313-231-002 Record No.: PLN-2024-18901 / SMR-08-91XX Blue Lake area A fifteen-year (15) extension of the Reclamation Plan (SMR-08-91XX) (CA Mine ID #91-12-0032) for the existing in-stream operations on the Blue Lake Bar. A vested rights determination was made in 1992 for the annual maximum extraction of 50,000 cubic yards. Blue Lake Bar is located just downstream (west) of the confluence of the Main Stem Mad River and the North Fork Mad River. Primary access to the site is off a private drive at the end of Taylor Way accessing Hatchery Road approximately 800 feet north of Hatchery Road Bridge. Portions of the operation are located within the City of Blue Lake. If approved, the Reclamation Plan will expire July 29, 2037.
Attachments: 1. 18901 Staff Report 7.18.24, 2. Attachment 1 - Draft Resolution, 3. Attachment 2A - Conditions of Approval, 4. Attachment 2B - Original Conditions of Approval, 5. Attachment 3A - Addendum to MND, 6. Attachment 3B - Reclamation Plan - CEQA MND, 7. Attachment 4 - Applicant’s Evidence in Support of the Required Findings, 8. Attachment 4A - Reclamation Plan revised 12.1.2023, 9. Attachment 4B - Financial Assurance Cost Estimate
To: Zoning Administrator

From: Planning and Building Department

Agenda Section: Consent

SUBJECT:
title
Blue Lake Gravel Bar renewal of SMARA Reclamation Plan and Review of Financial Assurance Cost Estimates
Assessor's Parcel Numbers (APN) 312-161-007, 312-161-020, 313-231-001, 313-231-002
Record No.: PLN-2024-18901 / SMR-08-91XX
Blue Lake area

A fifteen-year (15) extension of the Reclamation Plan (SMR-08-91XX) (CA Mine ID #91-12-0032) for the existing in-stream operations on the Blue Lake Bar. A vested rights determination was made in 1992 for the annual maximum extraction of 50,000 cubic yards. Blue Lake Bar is located just downstream (west) of the confluence of the Main Stem Mad River and the North Fork Mad River. Primary access to the site is off a private drive at the end of Taylor Way accessing Hatchery Road approximately 800 feet north of Hatchery Road Bridge. Portions of the operation are located within the City of Blue Lake. If approved, the Reclamation Plan will expire July 29, 2037.
end

RECOMMENDATION(S):
Recommendation
That the Zoning Administrator:
1. Adopt the resolution (Resolution 24-__). (Attachment 1) which does the following:
a. Finds that the Zoning Administrator has considered the Mitigated Negative Declaration previously adopted for the Blue Lake Bar SMARA Reclamation Plan and the Addendum that was prepared for the Blue Lake Bar Reclamation Plan Renewal (Attachment 3.A); and
b. Finds that the proposed project complies with the General Plan and Zoning Ordinance; and
c. Approves the Renewal of the Blue Lake Bar SMARA Reclamation Plan Renewal subject to the recommended conditions of approval (Attachment 2.A).

Body
DISCUSSION:
Project Location:
The project is located in the Blue Lake area, on the south side of State Highway 299, approximately 0.5 miles west from the intersection of Hatchery Road and Taylor Way, on the properties known 791 Taylor Way and properties known to be in Section 30 Township 06 North Range 02 East H...