Legislation Details

File #: 26-497    Version: 1 Name:
Type: Resolution Status: Continued
File created: 5/15/2026 In control: Planning Commission
On agenda: 5/21/2026 Final action:
Title: Cisco Farms Conditional Use Permits and Zoning Clearance Certificates Modification Application Number: PLN-2026-19479 Assessor's Parcel Numbers: 105-101-011-000, 104-191-001-000, 104-232-005-000 Petrolia area A Modification to a cannabis cultivation permit allowing 5 acres of cannabis cultivation, appurtenant drying facilities, approximately 1.6 acres of Commercial Nursery space, 19,200 square feet of dry space, and a 3,000 square foot processing facility (PLN-2021-17384). The original approval included rainwater catchment as the irrigation source, which was comprised of a 2.65-million-gallon rainwater catchment pond and 38 -5,000-gallon hard tanks connected to impervious surfaces including greenhouse skins and other structures. The applicant is proposing a change to the approved irrigation water source to add an existing, permitted, non-diversionary groundwater well. The applicant is also proposing a modification of General Condition of Approval #4 to allow for a "qualified engineer"...
Attachments: 1. 19479 Continuation Staff Report 5.21.26
Previous Action/Referral: 26-439

To:                                                               Planning Commission

 

From:                                          Planning and Building Department                                          

 

Agenda Section:                     Consent                                                               

 

SUBJECT:

title

Cisco Farms Conditional Use Permits and Zoning Clearance Certificates Modification

Application Number: PLN-2026-19479

Assessor’s Parcel Numbers: 105-101-011-000, 104-191-001-000, 104-232-005-000

Petrolia area

 

A Modification to a cannabis cultivation permit allowing 5 acres of cannabis cultivation, appurtenant drying facilities, approximately 1.6 acres of Commercial Nursery space, 19,200 square feet of dry space, and a 3,000 square foot processing facility (PLN-2021-17384). The original approval included rainwater catchment as the irrigation source, which was comprised of a 2.65-million-gallon rainwater catchment pond and 38 -5,000-gallon hard tanks connected to impervious surfaces including greenhouse skins and other structures. The applicant is proposing a change to the approved irrigation water source to add an existing, permitted, non-diversionary groundwater well. The applicant is also proposing a modification of General Condition of Approval #4 to allow for a "qualified engineer" to be able to submit a report to evaluate the groundwater well.

 

end

RECOMMENDATION(S):

Recommendation

That the Planning Commission:

 

1.                     Continue the Cisco Farms Conditional Use Permits and Zoning Clearance Certificates modification to a date uncertain.

 

Body