Legislation Details

File #: 26-540    Version: 1 Name:
Type: Informational Report Status: Passed
File created: 5/22/2026 In control: Public Works
On agenda: 6/23/2026 Final action: 6/23/2026
Title: Public Works Measure O - 2026 Cedar Street (3K280) Post Mile 0.32 to 0.72 and Redwood Street (3K260) Post Mile 0.00 to 0.23
Strategic Framework: 1000 - SAFE AND HEALTHY COMMUNITIES, 1003 – Achieve community connectivity with bicycle/pedestrian trails, 1007 – Improve the transportation network to be multi-modal, safe, sustainable and equitable, 1009 – Expand County Infrastructure Resilience, 9999 - Core Services / Other
Attachments: 1. Staff Report, 2. Plans for Public Works Measure O - 2026 Cedar St and Redwood St_6.9.26.pdf, 3. Special Provisions for Public Works Measure O - 2026 Cedar St and Redwood St_6.9.26r2.pdf, 4. CEQA NOE - 2026 Measure O Cedar and Redwood Streets.pdf, 5. Notice to bidders Public Works Measure O - 2026 Cedar St and Redwood St_6.9.2026r1.pdf

To: Board of Supervisors

From: Public Works

Agenda Section: Consent

Vote Requirement: Majority

SUBJECT:
title
Public Works Measure O - 2026 Cedar Street (3K280) Post Mile 0.32 to 0.72 and Redwood Street (3K260) Post Mile 0.00 to 0.23
end

RECOMMENDATION(S):
Recommendation
That the Board of Supervisors:
1. Approve the attached plans and specifications for the Public Works Measure O - 2026 Cedar Street (3K280) Post Mile 0.32 to 0.72 and Redwood Street (3K260) Post Mile 0.00 to 0.23; and
2. Approve the installation of three speed humps on Cedar Street as shown in the attached plans; and
3. Find that the project is exempt from environmental review pursuant to Section 15301 and Section 15302 of the California Environmental Quality Act (CEQA) Guidelines; and
4. Direct the Clerk of the Board to advertise the above-mentioned project as required by Section 22037 of the California Public Contract Code, with bids to be opened on Tuesday, July 21, 2026, at 2 p.m.

Body
STRATEGIC PLAN:
This action supports the following areas of your Board's Strategic Plan.
Area of Focus: Safe & Healthy Communities
Strategic Plan Category: 1009 - Expand county infrastructure resilience

DISCUSSION:
The Public Works Measure O - 2026 Cedar Street (3K280) Post Mile 0.32 to 0.72 and Redwood Street (3K260) Post Mile 0.00 to 0.23 consists of cold planning existing roadway, installing concrete curb ramps to current standards, replacing drainage inlets and culverts, placing hot mix asphalt, installing speed humps, and applying thermoplastic striping.

Located in the Cutten area of Eureka, the Project is near two public schools and one special education school. To improve safety for students, pedestrians, and cyclists, the Project will install bike lanes on both sides of the roadway along both Cedar Street and Redwood Street, and place three speed humps on Cedar Street to calm traffic. Additionally, curb ramps at seven locations will be upgraded to comply with current Americans w...

Click here for full text