Title
Salt River Bridge Replacement on Waddington Road (C3G025) at PM 1.69; Project No.: BRLOZB-5904 (094); Contract No.: 594011
Recommendation
That the Board of Supervisors authorize the Director of Public Works to sign Contract Change Order Number 2 for the amount of $37,136.70; and direct the Auditor-Controller to transfer $26,169.00 to 1200321-0316 per the attached appropriation transfer.