Skip to main content
File #: 23-745    Version: 1 Name:
Type: Resolution Status: Consent Agenda
File created: 5/25/2023 In control: Zoning Administrator
On agenda: 6/1/2023 Final action:
Title: David Coffey Special Permit Assessor Parcel Number (APN) 211-331-005 Record No.: PLN-12995-SP Myers Flat area A Special Permit for 9,080 square feet of existing outdoor full-sun cannabis cultivation with 900 sf of outdoor full-sun ancillary propagation. There is one cultivation cycle per year. Water for irrigation will be sourced from rain catchment from roof tops. Annual water use for irrigation is 64,000 gallons and was historically sourced from a well on site that will now be used for domestic purposes only. Current water storage on site consists of three tanks totaling 6,500 gallons and one 20,000-gallon water bladder that is to be removed. The applicant is proposing to add 12 water tanks, bringing the storage capacity on site to 64,500 gallons. The project will be done in two phases as additional water storage is installed. By limiting the initial square footage in phase one to 3,360 square feet, the site can rely on rain catchment and existing water storage. Phase two o...
Sponsors: Planning and Building, Laura McClenagan
Attachments: 1. 12995 Coffey Staff Report, 2. Attachment 1 - Resolution, 3. Attachment 1A - Conditions of Approval, 4. Attachment 1B - Operations Plan, 5. Attachment 1C - Site Plan, 6. Attachment 2 - Location Maps, 7. Attachment 3 - CEQA Addendum, 8. Attachment 4 - Applicant's Evidence in Support of Required Findings, 9. Attachment 4A - Water Resources Protection Plan, 10. Attachment 5 - Referral Agency Comments and Recommendations
To: Zoning Administrator

From: Planning and Building Department

Agenda Section: Consent

SUBJECT:
title
David Coffey Special Permit
Assessor Parcel Number (APN) 211-331-005
Record No.: PLN-12995-SP
Myers Flat area

A Special Permit for 9,080 square feet of existing outdoor full-sun cannabis cultivation with 900 sf of outdoor full-sun ancillary propagation. There is one cultivation cycle per year. Water for irrigation will be sourced from rain catchment from roof tops. Annual water use for irrigation is 64,000 gallons and was historically sourced from a well on site that will now be used for domestic purposes only. Current water storage on site consists of three tanks totaling 6,500 gallons and one 20,000-gallon water bladder that is to be removed. The applicant is proposing to add 12 water tanks, bringing the storage capacity on site to 64,500 gallons. The project will be done in two phases as additional water storage is installed. By limiting the initial square footage in phase one to 3,360 square feet, the site can rely on rain catchment and existing water storage. Phase two of the project will occur after the applicant has added the necessary water storage to the parcel. The site will then increase operations to the full 9,080 square feet of cultivation. The site is owner-operated, and no employees are utilized. Processing occurs onsite in an existing 160 square-foot storage container. Electricity is sourced from PG&E with a generator onsite for emergencies.
end

RECOMMENDATION(S):
Recommendation
That the Zoning Administrator:
1. Adopt the resolution (Resolution 23-__). (Attachment 1) which does the following:
a. Finds that the Zoning Administrator has considered the adopted Mitigated Negative Declaration for the Commercial Medical Marijuana Land Use Ordinance and the Addendum that was prepared for the David Coffey project; and
b. Finds that the proposed project complies with the General Plan and Zoning Ordinance; and
c. Approves the ...

Click here for full text