To: Planning Commission
From: Planning and Building Department
Agenda Section: Public Hearing
SUBJECT:
title
North Coast Highway Solar
Assessor Parcel Numbers (APNs) 204-171-045, 204-171-047, 204-081-002, 204-081-006, 204-081-007, 204-171-001
Record No.: PLN-2020-16341
Alton area
A Conditional Use Permit is being requested to authorize construction and operation of a 2.8-megawatt solar photovoltaic power generation facility to produce renewable energy for the power grid. The automated facility would occupy an approximately 11-acre fenced area with arrays of solar panels, single-axis trackers, string inverters, transformers, and associated electrical equipment. Approximately 300 feet of new road is proposed to be developed to connect with a new driveway encroachment along Highway 36, approximately 70 feet west of the existing driveway encroachment. A power line and poles will be run to the site along the driveway route, to allow interconnection to the nearby 12 kilovolt power distribution line located within the highway right-of-way near the driveway encroachment. Approximately 7 acres of the site will be occupied by the solar array. New impervious surfaces totaling approximately 1,500 square feet will be limited to the piles supporting the panel arrays and concrete pads below electrical equipment (approx. 1,060 ft.) Areas beneath the panel will remain vegetated and the project sponsor will maintain continual operation of agricultural uses on the property, including but not limited to sheep grazing, the keeping of honeybees, or planting of row crops, on a rotational basis. Site construction is expected to take approximately 4 months and operation will run for a minimum of 20 years under a power purchase agreement with Redwood Coast Energy Authority (RCEA). Maintenance staff are expected to visit the site on a weekly basis following the start of operation.
end
RECOMMENDATION(S):
Recommendation
That the Planning Commission:
1. Adopt the reso...
Click here for full text