Title: Hogan Special Permit Assessor Parcel Numbers: 208-241-018-000 Record Numbers: PLN-12162-SP Dinsmore area Hogan seeks a Special Permit (SP) for an existing 5,325-square-foot (SF) outdoor cultivation. Water for irrigation is sourced from an existing 38,000-gallon rain catchment pond. Estimated annual water usage is 50,000 gallons (11.04 gallons/SF/year). Total water storage is 51,500 gallons in a pond and hard tank storage with an additional 5,000 gallons of storage for fire suppression via (2) 2,500 storage tanks. Processing will be performed offsite at a licensed third-party processing facility. Power is provided by generators but is conditioned to convert to a renewable source by January 1st, 2026.
Attachments: 1. 12162 Staff Report 11.07.24, 2. Attachment 1 - Draft Resolution, 3. Attachment 1A - Conditions of Approval, 4. Attachment 1B - Cultivation and Operations Plan 02.03.2020, 5. Attachment 1C - Site Plan 12.31.2019, 6. Attachment 3 - CEQA Addendum, 7. Attachment 4A - Revised Site Management Plan, 8. Attachment 4B - Road Evaluation 12.31.2019, 9. Attachment 4C - Final LSAA, 10. Attachment 5 - Referral Agency Comments and Recomendations, 11. Attachment 5A - 12162 DEH ReferralForm, 12. Attachment 5B - 12162 Public Works 10.25.2024, 13. Attachment 5C - 12162 CDFW 05.15.2024
To: Zoning Administrator

From: Planning and Building Department

Agenda Section: Consent

SUBJECT:
title
Hogan Special Permit
Assessor Parcel Numbers: 208-241-018-000
Record Numbers: PLN-12162-SP
Dinsmore area

Hogan seeks a Special Permit (SP) for an existing 5,325-square-foot (SF) outdoor cultivation. Water for irrigation is sourced from an existing 38,000-gallon rain catchment pond. Estimated annual water usage is 50,000 gallons (11.04 gallons/SF/year). Total water storage is 51,500 gallons in a pond and hard tank storage with an additional 5,000 gallons of storage for fire suppression via (2) 2,500 storage tanks. Processing will be performed offsite at a licensed third-party processing facility. Power is provided by generators but is conditioned to convert to a renewable source by January 1st, 2026.
end

RECOMMENDATION(S):
Recommendation
That the Zoning Administrator:
1. Adopt the resolution (Resolution 24-__). (Attachment 1) which does the following:
a. Finds the Zoning Administrator has considered the Mitigated Negative Declaration previously adopted for the Commercial Medical Marijuana Land Use Ordinance and the Addendum that was prepared for the Hogan project (Attachment 3); and
b. Finds the proposed project complies with the General Plan and Zoning Ordinance; and
c. Approves the Special Permit subject to the recommended conditions of approval (Attachment 1A)
Body

DISCUSSION:
Project Location:
The project is located in the Dinsmore area, on both sides of Ridge Road, approximately 5.3 miles northwest from the intersection of State Highway 36 and County Line Creek Road, on the property known to be in the south half of Section 36, Township 02 North, Range 05 East.

Present General Plan Land Use Designation:
Residential Agriculture (RA), 2017 General Plan, Density: 20-160 acres per unit, Slope Stability: High Instability (3).

Present Zoning:
Forestry Recreation (FR), Minimum Building Site Area 40 Acres [B-5(40)]