Legislation Details

File #: 26-980    Version: 1 Name:
Type: Resolution Status: New Business
File created: 9/10/2026 In control: Zoning Administrator
On agenda: 9/17/2026 Final action:
Title: Savage Creek Water Diversion System Improvements Project Coastal Development Permit Extension Assessor Parcel Number: Caltrans Right-of-Way Record No.: PLN-2026-19504 Trinidad Area A two-year extension of a previously approved Coastal Development Permit (PLN-2023-18281) for the replacement of various infrastructure components associated with an existing Caltrans water diversion on Savage Creek. The permitted upgrades include the replacement of a sump well and water lines (in-kind) and installation of a backwash system at Seawood Drive. The surface water diversion at Savage Creek supplies municipal water to both the Trinidad Southbound Safety Roadside Rest Area (SRRA) and the Seawood Estates Mutual Water Company (SEMWC). The purpose of the project is to upgrade the existing water supply intake system to be more reliable and require less maintenance. In addition, the project would improve influent water quality and incorporate design improvements for aquatic species. The project wou...
Sponsors: Planning and Building
Attachments: 1. 19504 Staff Report 9.17.26, 2. Attachment 1 - Draft Resolution, 3. Attachment 2 - ZA Resolution 24-008_Savage Creek Water Diversion_18281, 4. Attachment 2A - Conditions of Approval, 5. Attachment 2B - Project Description, 6. Attachment 2C - Project Design
To: Zoning Administrator

From: Planning and Building Department

Agenda Section: Consent

SUBJECT:
title
Savage Creek Water Diversion System Improvements Project Coastal Development Permit
Extension
Assessor Parcel Number: Caltrans Right-of-Way
Record No.: PLN-2026-19504
Trinidad Area

A two-year extension of a previously approved Coastal Development Permit (PLN-2023-18281) for the replacement of various infrastructure components associated with an existing Caltrans water diversion on Savage Creek. The permitted upgrades include the replacement of a sump well and water lines (in-kind) and installation of a backwash system at Seawood Drive. The surface water diversion at Savage Creek supplies municipal water to both the Trinidad Southbound Safety Roadside Rest Area (SRRA) and the Seawood Estates Mutual Water Company (SEMWC). The purpose of the project is to upgrade the existing water supply intake system to be more reliable and require less maintenance. In addition, the project would improve influent water quality and incorporate design improvements for aquatic species. The project would require a temporary creek diversion approximately 80 feet upstream of the work area. No changes to the project are proposed. A permit extension is being requested because construction for the project will not begin before the expiration of this permit. Construction is anticipated to begin and be completed during the 2026 dry season. If approved, the permit will expire on March 7,2028.

end
RECOMMENDATION(S):
Recommendation
That the Zoning Administrator:
1 - Adopt the resolution, (Attachment 1) which does the following:

2 - Find that the proposed project complies with the Trinidad Area Plan; and

3 - Find the project exempt from further environmental review pursuant to Sections 15302(c) Replacement or Reconstruction, and 15304(f) Minor Alterations of Land of the California Environmental Quality Act (CEQA) Guidelines, and that there is no substantial evidence that...

Click here for full text