File #: 20-564    Version: 1 Name:
Type: Informational Report Status: Passed
File created: 4/30/2020 In control: Public Works
On agenda: 5/19/2020 Final action: 5/19/2020
Title: Storm Damage Repair to Alderpoint Road (6B165) Post Miles 41.45, 43.55, 46.15 and 46.23
Attachments: 1. Staff Report, 2. Alderpoint Road North SD Sites_Planset_5-6-2020.pdf, 3. Alderpoint Road North SD Sites_Special Provisions_5-6-2020.pdf
To: Board of Supervisors

From: Public Works

Agenda Section: Consent

SUBJECT:
title
Storm Damage Repair to Alderpoint Road (6B165) Post Miles 41.45, 43.55, 46.15 and 46.23
end

RECOMMENDATION(S):
Recommendation
That the Board of Supervisors:
1. Approve the attached plans and specifications for the Alderpoint Road (6B165) Post Miles 41.45, 43.55, 46.15 and 46.23 Storm Damage Repair Project; and
2. Direct the Clerk of the Board to advertise the above-mentioned project as required by Section 22037 of the California Public Contract Code, with bids to be opened on Tuesday, June 23, 2020, at 2:00 p.m.

Body
SOURCE OF FUNDING:
Road Fund (1200); Federal Highway Administration Emergency Relief Storm Damage Funds

DISCUSSION:
On Mar. 7, 2017, the Governor of the State of California declared a disaster for Humboldt County due to severe winter storms, flooding and mudslides. Alderpoint Road (6B165) Post Miles 41.45, 43.55, 46.15 and 46.23, in the Bridgeville area of eastern Humboldt County, experienced roadway, embankment and bridge approach damage. Emergency temporary repairs were done at the time of the disaster to maintain essential traffic flows.

On Sept. 19, 2019, and Nov. 7, 2019, the Humboldt County Department of Public Works ("Public Works") received Federal Highway Administration funding approval to proceed with the Alderpoint Road (6B165) Post Miles 41.45, 43.55, 46.15 and 46.23 Storm Damage Repair Project. Public Works subsequently prepared the attached plans and specifications for the project, which includes constructing a rock buttress, regrading and stabilizing the roadway with geogrid, installing crash cushions, constructing gabion for shoulder stabilization and sediment and erosion control items.

Accordingly, Public Works recommends that the Board of Supervisors approve the attached plans and specifications and advertise the Alderpoint Road (6B165) Post Miles 41.45, 43.55, 46.15 and 46.23 Storm Damage Repair Project.

FINANCIAL IMPAC...