Skip to main content
File #: 21-445    Version: 1 Name:
Type: Zoning Item Status: Continued
File created: 4/8/2021 In control: Planning Commission
On agenda: 4/15/2021 Final action:
Title: Greentech Industries, LLC, Conditional Use Permit Record Number PLN-12823-CUP Assessor Parcel Number (APN): 222-222-013-000. Redway area Greentech Industries, LLC seeks approval for a total of 13,150 square feet (SF) of existing cannabis cultivation consisting of 6,800 SF of mixed light and 6,350 SF of outdoor cannabis cultivation. Propagation occurs in a 1,700 SF nursery. Irrigation water is sourced from a spring diversion from an unnamed onsite Class II watercourse that is a tributary to the South Fork Eel River. Existing onsite water storage is 77,500 gallons in the following HDPE hard tanks: fourteen (14) 5,000-gallon tanks and three (3) 2,500-gallon tanks. Annual water use is estimated at 155,000 gallons (11.8 gal/SF). Post-cultivation processing activities include drying, trimming and packaging and will occur in a proposed 4,500-SF building onsite. Electricity will be provided by PG&E, and one (1) backup generator (7 kW) is onsite in the event of power outages.

Title

Greentech Industries, LLC, Conditional Use Permit

Record Number PLN-12823-CUP

Assessor Parcel Number (APN): 222-222-013-000.

Redway area

 

Greentech Industries, LLC seeks approval for a total of 13,150 square feet (SF) of existing cannabis cultivation consisting of 6,800 SF of mixed light and 6,350 SF of outdoor cannabis cultivation. Propagation occurs in a 1,700 SF nursery. Irrigation water is sourced from a spring diversion from an unnamed onsite Class II watercourse that is a tributary to the South Fork Eel River. Existing onsite water storage is 77,500 gallons in the following HDPE hard tanks: fourteen (14) 5,000-gallon tanks and three (3) 2,500-gallon tanks. Annual water use is estimated at 155,000 gallons (11.8 gal/SF).  Post-cultivation processing activities include drying, trimming and packaging and will occur in a proposed 4,500-SF building onsite. Electricity will be provided by PG&E, and one (1) backup generator (7 kW) is onsite in the event of power outages. 

 

Recommendation

Continue this project to the May 6, 2021 Planning Commission hearing.