Legislation Details

File #: 26-540    Version: 1 Name:
Type: Informational Report Status: Passed
File created: 5/22/2026 In control: Public Works
On agenda: 6/23/2026 Final action: 6/23/2026
Title: Public Works Measure O - 2026 Cedar Street (3K280) Post Mile 0.32 to 0.72 and Redwood Street (3K260) Post Mile 0.00 to 0.23
Strategic Framework: 1000 - SAFE AND HEALTHY COMMUNITIES, 1003 – Achieve community connectivity with bicycle/pedestrian trails, 1007 – Improve the transportation network to be multi-modal, safe, sustainable and equitable, 1009 – Expand County Infrastructure Resilience, 9999 - Core Services / Other
Attachments: 1. Staff Report, 2. Plans for Public Works Measure O - 2026 Cedar St and Redwood St_6.9.26.pdf, 3. Special Provisions for Public Works Measure O - 2026 Cedar St and Redwood St_6.9.26r2.pdf, 4. CEQA NOE - 2026 Measure O Cedar and Redwood Streets.pdf, 5. Notice to bidders Public Works Measure O - 2026 Cedar St and Redwood St_6.9.2026r1.pdf

 

To:                                                               Board of Supervisors

 

From:                                          Public Works                                          

 

Agenda Section:                     Consent                     

 

Vote Requirement:                     Majority

 

SUBJECT:

title

Public Works Measure O - 2026 Cedar Street (3K280) Post Mile 0.32 to 0.72 and Redwood Street (3K260) Post Mile 0.00 to 0.23

end

 

RECOMMENDATION(S):

Recommendation

That the Board of Supervisors:

1.                     Approve the attached plans and specifications for the Public Works Measure O - 2026 Cedar Street (3K280) Post Mile 0.32 to 0.72 and Redwood Street (3K260) Post Mile 0.00 to 0.23; and

2.                     Approve the installation of three speed humps on Cedar Street as shown in the attached plans; and

3.                     Find that the project is exempt from environmental review pursuant to Section 15301 and Section 15302 of the California Environmental Quality Act (CEQA) Guidelines; and

4.                     Direct the Clerk of the Board to advertise the above-mentioned project as required by Section 22037 of the California Public Contract Code, with bids to be opened on Tuesday, July 21, 2026, at 2 p.m.

 

Body

STRATEGIC PLAN:

This action supports the following areas of your Board’s Strategic Plan.

Area of Focus:  Safe & Healthy Communities                     

Strategic Plan Category:  1009 - Expand county infrastructure resilience

 

DISCUSSION:

The Public Works Measure O - 2026 Cedar Street (3K280) Post Mile 0.32 to 0.72 and Redwood Street (3K260) Post Mile 0.00 to 0.23 consists of cold planning existing roadway, installing concrete curb ramps to current standards, replacing drainage inlets and culverts, placing hot mix asphalt, installing speed humps, and applying thermoplastic striping. 

 

Located in the Cutten area of Eureka, the Project is near two public schools and one special education school. To improve safety for students, pedestrians, and cyclists, the Project will install bike lanes on both sides of the roadway along both Cedar Street and Redwood Street, and place three speed humps on Cedar Street to calm traffic.  Additionally, curb ramps at seven locations will be upgraded to comply with current Americans with Disabilities Act (ADA) standards.

The Public Works Measure O - 2026 Cedar Street (3K280) Post Mile 0.32 to 0.72 and Redwood Street (3K260) Post Mile 0.00 to 0.23 Project mentioned herein falls under Categorical Exemption Class 1 (Existing Facilities) and Class 2 (Reconstruction) under State CEQA Guidelines Section 15301 and 15302.  This exemption applies to projects that are existing facilities and consist of repair, maintenance, or minor alteration of existing facilities.  Resurfacing of existing structures on the same site with the same purpose and capacity is appropriate for existing facilities maintained by the Public Works Department.

 

Accordingly, Public Works recommends that the Board of Supervisors approve the attached plans and specifications; approve the installation of three speed humps, find that the project is exempt from environmental review pursuant to Section 15301 of the CEQA Guidelines; and advertise the Public Works Measure O - 2026 Cedar Street (3K280) Post Mile 0.32 to 0.72 and Redwood Street (3K260) Post Mile 0.00 to 0.23.

 

SOURCE OF FUNDING: 

Road Fund (1200), Public Works Measure O

 

FINANCIAL IMPACT:

Expenditures (1200-342)

FY26-27

Engineer’s Cost of Contract Items

 $1,372,905

Total Expenditures

 $1,372,905

Funding Sources (1200-342)

FY26-27

Public Works Measure O (1200-342)

 $1,372,905

Total Funding Sources

 $1,372,905

*Projected amounts are estimates and are subject to change.

 

Narrative Explanation of Financial Impact:

There is no financial commitment until the Public Works Measure O - 2026 Cedar Street (3K280) Post Mile 0.32 to 0.72 and Redwood Street (3K260) Post Mile 0.00 to 0.23 is awarded.  This project is being fully funded by Public Works Measure O. The engineer’s cost estimate for the project is $1,372,905.

 

Expenditure appropriations related to completion of the proposed Public Works Measure O - 2026 Cedar Street (3K280) Post Mile 0.32 to 0.72 and Redwood Street (3K260) Post Mile 0.00 to 0.23) is  included in the approved fiscal year 2026-27 budget for the Public Works Measure O budget, 1200-342.

 

STAFFING IMPACT:

Narrative Explanation of Staffing Impact:

There is no impact to current staffing levels related to the advertisement of the Public Works Measure O - 2026 Cedar Street (3K280) Post Mile 0.32 to 0.72 and Redwood Street (3K260) Post Mile 0.00 to 0.23.

 

OTHER AGENCY INVOLVEMENT:

Humboldt Community Services District

 

ALTERNATIVES TO STAFF RECOMMENDATIONS:

Your Board could choose not to approve the project. However, this is not recommended as this project will restore roadways using local funds that would not otherwise be available to the County of Humboldt.

 

ATTACHMENTS:

1.                     Plans for Public Works Measure O - 2026 Cedar Street (3K280) Post Mile 0.32 to 0.72 and Redwood Street (3K260) Post Mile 0.00 to 0.23

2.                     Special Provisions for Public Works Measure O - 2026 Cedar Street (3K280) Post Mile 0.32 to 0.72 and Redwood Street (3K260) Post Mile 0.00 to 0.23

3.                     CEQA NOE 2026 Measure O Cedar Street and Redwood Street

4.                     Notice to Bidders

 

PREVIOUS ACTION/REFERRAL:

Meeting of: N/A

File No.: N/A